You don't have javascript enabled. Good luck with that.
Pencarian
Dua Ekskavator Keruk PHB Taman Alfa

Two Excavators Dredged Taman Alfa Channel

Two excavators deployed by South Jakarta Water Resources Sub-dept. to dredge Taman Alfa connecting (PHB) channel, Petukangan Utara Urban Village, Pesanggrahan, Friday (3/17).

It is dredged to 1.5 meters depth, 800 meters long, and 6 meters wide

Pesanggrahan Sub-district Head, Agus Irwanto said this is one of the ways to minimize flood due to overflowed PHB water.

"It is dredged to 1.5 meters depth, 800 meters long, and 6 meters wide," he said.

Residents Request to Normalize Taruna PHB Channel

He added the dredged mud from PHB channel was transported to Rawa Minyak, Pasar Minggu by using Water Resources Sub-dept. truck.

"I wish with this dredging, Petukangan area that prone to flood can be resolved. At least water level could decrease," he closed.

Linked News
Popular News indeks
  1. Jakarta Removes Gibran’s Portraits Across All Government Offices

    access_time16-11-2026 remove_red_eye941 personFakhrizal Fakhri
  2. Transjakarta Offers Free Rides for Jakarta Vertical Run 2026 Participants

    access_time14-11-2026 remove_red_eye630 personAldi Geri Lumban Tobing
  3. Governor Approves Removal of Seven Unauthorized Houses on Dispora Land

    access_time13-11-2026 remove_red_eye604 personFakhrizal Fakhri
  4. Pramono Outlines Measures to Address Five Issues in Kramat Jati

    access_time13-11-2026 remove_red_eye595 personFakhrizal Fakhri
  5. Jakarta Esports 2026 Draws Enthusiastic Crowds at M Bloc Space

    access_time13-11-2026 remove_red_eye558 personTiyo Surya Sakti